Preparing and Placing of Concrete
1. Batching
2. Mixing
3. Transporting and placing and
4. Compacting.
1. Batching: The measurement of materials for making concrete is known as batching. The
following two methods of batching is practiced:
(a) Volume batching
(b) Weight batching.
(a) Volume Batching: In this method cement, sand and concrete are batched by volume. A gauge
box is made with wooden plates, its volume being equal to that of one bag of cement. One bag of cement has volume of 35 litres. The required amount of sand and coarse aggregate is added by measuring on to the gauge box. The quantity of water required for making concrete is found after deciding water cement ratio. For example, if water cement ratio is 0.5, for one bag of cement (50 kg), water required is 0.5 × 50 = 25 kg, which is equal to 25 litres. Suitable measure is used to select required quantity of water.
Volume batching is not ideal method of batching. Wet sand has higher volume for the same
weight of dry sand. It is called bulking of sand. Hence it upsets the calculated volume required.
(b) Weight Batching: This is the recommended method of batching. A weighing platform is
used in the field to pick up correct proportion of sand and coarse aggregates. Large weigh batching
plants have automatic weighing equipments.
2. Mixing: To produce uniform and good concrete, it is necessary to mix cement, sand and
coarse aggregate, first in dry condition and then in wet condition after adding water.
The following methods are practiced:
(a) Hand Mixing
(b) Machine Mixing.
(a) Hand Mixing: Required amount of coarse aggregate for a batch is weighed and is spread on
an impervious platform. Then the sand required for the batch is spread over coarse aggregate. They are mixed in dry condition by overturning the mix with shovels. Then the cement required for the batch is spread over the dry mix and mixed by shovels. After uniform texture is observed water is added gradually and mixing is continued. Full amount of water is added and mixing is completed when uniform colour and consistancy is observed. The process of mixing is completed in 6–8 minutes of adding water. This method of mixing is not very good but for small works it is commonly adopted.
(b) Machine Mixing: In large and important works machine mixing is preferred.
shows a typical concrete mixer. Required quantities if sand and coarse aggregates are placed in the
drum of the mixer. 4 to 5 rotations are made for dry mixing and then required quantity of cement is
added and dry mixing is made with another 4 to 5 rotations. Water is gradually added and drum is
rotated for 2 to 3 minutes during which period it makes about 50 rotations. At this stage uniform and
homogeneous mix is obtained.
3. Transporting and Placing of Concrete. After mixing concrete should be transported to the
final position. In small works it is transported in iron pans from hand to hand of a set of workers. Wheel barrow and hand carts also may be employed. In large scale concreting chutes and belt conveyors or pipes with pumps are employed. In transporting care should be taken to see that seggregation of aggregate from matrix of cement do not take place.
Concrete is placed on form works. The form works should be cleaned and properly oiled. If
concrete is to be placed for foundation, the soil bed should be compacted well and is made free from
loose soil.
Concrete should be dropped on its final position as closely as possible. If it is dropped from a
height, the coarse aggregates fall early and then mortar matrix. This segregation results into weaker
concrete.
4. Compaction of Concrete: In the process of placing concrete, air is entrapped. The entrapped
air reduces the strength of concrete up to 30%. Hence it is necessary to remove this entrapped air. This is achieved by compacting the concrete after placing it in its final position. Compaction can be carried out either by hand or with the help of vibrators.
(a) Hand Compaction: In this method concrete is compacted by ramming, tamping, spading or
by slicing with tools. In intricate portions a pointed steel rod of 16 mm diameter and about a metre long is used for poking the concrete.
(b) Compaction by Vibrators: Concrete can be compacted by using high frequency vibrators.
Vibration reduces the friction between the particles and set the motion of particles. As a result entrapped air is removed and the concrete is compacted. The use of vibrators reduces the compaction time. When vibrators are used for compaction, water cement ratio can be less, which also help in improving the strength of concrete. Vibration should be stopped as soon as cement paste is seen on the surface of concrete. Over vibration is not good for the concrete.
The following types of vibrators are commonly used in concreting:
(a) Needle or immersion vibrators
(b) Surface vibrators
(c) Form or shutter vibrators
(d) Vibrating tables.
Needle vibrators are used in concreting beams and columns. Surface vibrators and form vibrators
are useful in concreting slabs. Vibrating tables are useful in preparing precast concrete elements.